
Wall Branding Services in Abu Dhabi
Turn corporate and commercial walls into continuous, vibrant design features. We manufacture and apply high-durability, scratch-resistant wall wraps, seamless fabric murals, and computer-plotted vinyl graphics. Our complete in-house print production guarantees precise pantone matching, heavy ink saturation, and seamless alignment tailored for high-traffic public corridors.

Full Wall Wraps and Murals

Wall Lettering and Decals

Wall Canvas and Framed Portraits

Frontlit & Backlit 3D Wall Signs

Cutout & 3D Acrylic Wall Signs

Rigid Signs & Poster Displays
Wall Branding Projects in Abu Dhabi
- Wall Branding for Zutari — Corniche, Abu Dhabi:
- Wall wraps carrying company messaging and acrylic identification signs delivered across the corporate office interior. View Zutari Project →
- Wall Design & Branding for KBR — Abu Dhabi:
- Wall branding, corporate messaging, and navigation graphics delivered across the office floor plate. View KBR Project →
- Complete Campaign for IKEA — Al Wahda Mall, Abu Dhabi:
- Textured wall graphics delivered across the flagship retail location as part of a wider campaign rollout. View Ikea Project →















Share your vision with our branding experts today to launch a market-ready identity that instantly converts your target audience.
Professional Wall Branding Company in Abu Dhabi
Wall branding turns blank interior surfaces into brand, campaign or storytelling space. It can include vinyl murals, wall decals, printed wallpaper, acrylic accents, framed displays and dimensional wall features.
Ninety Nine Advertising LLC manages surface checks, artwork setup, print production and application for Abu Dhabi offices, retail spaces, clinics and hospitality interiors.


Compliance Context
In managed towers, malls, and Grade A buildings across Abu Dhabi, interior wall branding requires a No Objection Certificate from building management before production. The NOC covers materials, fixing methods, and finish protection.
Risk Prevention
- Film applied to an untested wall lifts within months — surface condition and paint cure govern the material, not a generic vinyl preference.
- Dimensional elements fixed without confirming wall build-up work loose — gypsum, hollow block, and cladding carry different anchor loads.
- Production committed before building management approval triggers reinstatement liability and project delay at the tenant's cost.
Customer Testimonials
Chosen by Abu Dhabi teams for clear timelines, responsive coordination, and consistent delivery.
On Track Cars Rental
We used Ninety Nine Advertising LLC for our shopfront signboard, blade sign, and interior 3D signage, and we’re very satisfied with the outcome. The work was completed professionally, on time, and with good attention to detail. The signage looks clean and works well for both exterior visibility and interior.
The Esports Agency
We engaged Ninety Nine Advertising LLC for a large-scale launch requiring branding across multiple assets and permit coordination. The team was solution-oriented, handled approvals smoothly, and maintained control throughout execution.
Al Bahri Engineering
We’ve been working with Ninety Nine Advertising LLC for several years now, and they continue to deliver reliable results. Our most recent project involved partial branding of multiple company vehicles, and once again the execution was clean and well organized.
Downtown Medical
From initial consultation through final installation, the project was handled with professionalism, attention to detail, and clear execution control. The team demonstrated a strong understanding of requirements and delivered high-quality signage with a seamless installation process.
Project Delivery Process
Site Assessment
Wall condition, paint cure, substrate, and building restrictions are assessed. Adhesion testing determines the material route.
Engineering & Planning
Material route, artwork, fixing method, and building approval are locked before production. Wiring is confirmed where needed.
Fabrication & Production
Graphics, acrylic elements, and dimensional signs are produced against locked specification and are checked before dispatch.
Installation & Handover
Work is installed against the agreed fixing strategy and alignment plan. Handover is accepted after visual and structural checks.